LEGAL NOTICE


 


Publication Date: February 24, 2019


 


To learn more about a project:


 


1. Call the Senior Planner assigned to the project; OR


2. Review the project file at Snohomish County Public Works (PW),3000 Rockefeller Avenue, Robert


J.DrewelBuilding, 2nd Floor,CustomerServiceCenter,Everett,Washington; Office Hours: Monday,


Tuesday, Wednesday and Friday from 8 a.m. to 4 p.m., and Thursday from 10 a.m. to 4 p.m., except


legal holidays. Please call the Senior Planner in advance to be certain the project file is available.


To comment on a project:


 


1. Submit written comments to Snohomish County Public Works, c/o Senior Planner, at the address


below. All comments received prior to a decision will be reviewed. To ensure that comments are


addressed, PW must receive them by the published comment end date; OR


2. E-mail comments to the Senior Planner with your name, address and contact number.


To appeal a SEPA decision:


 


There is no opportunity for appeal at this time. Pursuant to SCC 30.61.300(10), SEPA appeals related


to a shoreline substantial development permit shall be submitted to the state shorelines hearings


board together with appeal of the underlying permit.


 


How to reach us:


 


The Snohomish County Public Works Customer Service Center is located on the 2nd Floor of the


RobertJ.DrewelBuildingat3000 Rockefeller Avenue,Everett,Washington.


 


Planning and Development Services


 


 


3000 Rockefeller Avenue, M/S 607


Everett,WA98201


Phone: (425) 388-3488


Phone: (425) 388-3700 TTY:711


Fax: (425) 388-6449


 


http://www1.co.snohomish.wa.us/Departments/Public_Works/


 


NOTICE OF LAND DISTURBING ACTIVITIES AND SEPA THRESHOLD


DETERMINATION


(Pursuant to the provisions of Chapters 30.70.050(2) and 30.61 SCC)


 


Project Name:Mann RoadandBen Howard RoadImprovements


Project Number: RC1726


Project Description:SnohomishCountyhas identified several locations susceptible to flooding at or less


than a two-year recurrence interval: two locations are onBen Howard Road, and the third is on Mann


Road, south of the City ofSultanand State Route 2. Site A is the westernmost site located at a bend in


Ben Howard Road eastof McCoy Creek. An existing driveway culvert will be replaced, the culvert under


the road will be replaced with a 7-foot wide culvert, and the road raised by 2 feet for 400 linear feet. Site B


is west of the intersection ofBen Howard Roadand311th Avenue SE. An existing driveway culvert will be


replaced, a new 48-inch culvert will be installed underBen Howard Road, and the road raised 4.8 feet for


600 linear feet. Site C is the easternmost site located at Devil’s Elbow onMann Road. A driveway culvert


will be replaced, and the culvert under the road will be replaced with a new 17-foot concrete box culvert.Two


additional 48-inch drainage culverts will be installed side by side further to the east. The road will be raised


6 feet for 700 linear feet. Guardrail will be installed. Construction is scheduled for 2021.


Project Location: The project sites are located in Sections 5, 7 and 8, Township 27 North, Range 8 East,


 


W.M.


Type of Project: Roadway improvements, including installation of culverts.


Permits/Approvals Required: Shoreline Substantial Development Permit, Land Disturbing


Activity Permit and other applicable federal, state and local permits.


SEPA Decision: On February 8, 2019, Public Works determined that this project does not have a probable,


significant adverse impact on the environment and has issued a Determination of Non-significance (DNS).


An environmental impact statement (EIS) under RCW 43.21C.030(2)(c) is not required. This decision was


made after review of a completed environmental checklist and other information on file with this agency.


Project Comment Period: Submit written or e-mailed comments on or before 5 p.m., Monday, March 18,


2019.


SEPA Appeal Period: There is no opportunity for appeal at this time. Pursuant to SCC 30.61.300(10),


SEPA appeals related to a shoreline substantial development permit, which is a Type 1 decision, shall be


submitted to the state shorelines hearings board together with appeal of the underlying permit.


Senior Planner: Julie Highton, 425-262-2341