Sign In
 [New User? Sign Up]
 
Mobile Version

SCPW ROADM-10-13/ENVS-Auld

  • Email Friend
  • Save Ad
  • QR Code
Category: Events and Notices - Legal and Public Notices
Posted: 02/02/2020
 

Details

Publication Date: February 2, 2020


 


To learn more about a project:


 


1. Call the Senior Planner assigned to the project; OR


2. Review the project file at Snohomish County Public Works (PW),3000 Rockefeller Avenue,


RobertJ.DrewelBuilding, 2nd Floor, Customer Service Counter,Everett,Washington; Office Hours:


M-F 8-5 except legal holidays. Please call the Senior Planner in advance to be certain the project file


is available.


To comment on a project:


 


1. Submit written comments to Snohomish County Public Works, c/o Senior Planner, at the address


below. All comments received prior to a decision will be reviewed. To ensure that comments are


addressed, PW must receive them by 5 p.m., published comment end date; OR


2. E-mail comments to the Senior Planner with your name, address and contact number.


How to reach us:


 


The Snohomish County Public Works Customer Service Counter is located on the 2nd Floor of the


RobertJ.DrewelBuildingat3000 Rockefeller Avenue,Everett,Washington.


 


SnohomishCountyPublic Works


 


 


LEGAL NOTICE


 


 


3000 Rockefeller Avenue, M/S 607


Everett,WA98201


Phone: (425) 262-0460


Phone: (425) 388-3700 TTY: 711


Fax: (425) 388-6674


 


http://www1.co.snohomish.wa.us/Departments/Public_Works/


 


Title VI and Americans with Disabilities Act (ADA) Information: It isSnohomishCounty’s policy


to assure that no person shall on the grounds of race, color, national origin, or sex as provided by


Title VI of the Civil Rights Act of 1964, as amended, be excluded from participation in, be denied the


benefits of, or otherwise be discriminated against under any County sponsored program or activity.


For questions regarding Snohomish County Public Works’ Title VI Program, or for interpreter or


translation services for non-English speakers, or otherwise making materials available in an alternate


format, contact the Department Title VI Coordinator via e-mail at spw-titlevi@snoco.org or phone 425388-


6660. Hearing/speech impaired may call theWashingtonRelayCenterat 711.


 


NOTICE OF SEPA THRESHOLD DETERMINATION


LEGAL NOTICE


 


 


(Pursuant to the provisions of Chapters 30.70.050(2) and 30.61 SCC)


Project Name: Public Works Geotechnical Exploration Program Project Number: N/A


Project Description:SnohomishCountyplans to conduct geotechnical field explorations for proposed Public


Works projects. These geotechnical explorations will be done to evaluate and characterize subsurface


conditions and to collect soil samples. The information developed from the subsurface explorations will


be used in developing project design recommendations for stormwater management systems, bridge


foundations, slopes, walls and roadways. Subsurface explorations may be generally grouped in three


classifications: (1) mechanized borings, (2) mechanized excavations (test pits), and (3) manual excavations.


Project Location: Exploration sites will occur throughoutSnohomishCounty. Projects that may require


geotechnical exploration within the time frame of the Programmatic Checklist include, but are not limited to,


the following projects: Fish Creek Culvert Replacement; Miller Creek Culvert Replacement;LakeStickney


Pedestrian Improvements; 52 Ave W: 164 St SW toLynnwoodcenterline Pedestrian Improvements; Center


Rd Pedestrian Improvements: 10 Ave W to 8 Ave W;Poplar Way: 208 Pl SW toLarch WayPedestrian


Improvements;Lincoln Way:Beverly Park Rdto SR 525 sidewalk;Ash Way:164th St SWtoGibson Rd;


148th St SW: 35 Ave W to Jefferson Way;148th St SW:Jefferson WaytoAsh Way; Poplar Way:Lynnwood


City Limits to Larch Way;Alderwood Mall Parkway: 168 St SW to SR 525;Larch Way: 212 St SW toCypress


Way (N);Larch Way/Poplar WayIntersection Improvement;Manor Way:164th St SWto 148 St SW; Meadow


Rd/Interurban Trail Improvements;Maple Rd/Butternut RdIntersection Improvements; Swamp Creek


Bridge #503 Replacement;43rd Ave SE: SR 524 to 180 St SE; Emergent Road Bank Stabilization Projects.


Type of Project or Activity: Geotech Exploration for Public Works projects


Permits and Approvals Required: Varies by activity


SEPA Decision: Determination of Non-Significance


Project Comment Period: Comment period ends February 18, 2020


SEPA Appeal Period: The DNS may be appealed pursuant to the requirements of SCC 30.61.300 and must


be received no later than 5 p.m., February 18, 2020


Completeness Date: January 10, 2020


Senior Planner, Mary Auld, 425-262-2460


Senior Planner E-mail: mary.auld@snoco.org


 


Published: February 2, 2020 2469234


 


2469234


See PDF at: http://50.47.68.138/classified/legals/pdf/2020/2469234.pdf

Contact Seller

* required information
Powered By Adicio